
Kitchen Cabinet Refacing VS Replacing: Which Is Right For Your NJ Kitchen?
Kitchen cabinet remodeling is where the biggest savings hide. Refacing keeps sound boxes and replaces every visible surface for $7,500–$22,000; full replacement starts where cabinetry becomes 40% of a remodel. The right call depends entirely on what we find behind the doors.
Reface When The Boxes Are Sound
- Plywood or solid boxes with no swelling at the sink base.
- Layout already works and nothing needs to move.
- Face frames are square and firmly attached to the wall.
- You want a 1–3 week job instead of 5–8 weeks.
Replace When Any Of These Are True
- Particleboard boxes that are sagging, delaminating or water-damaged.
- You are moving the sink, range or a wall new layout, new cabinetry.
- You need different cabinet heights, depths or drawer configurations.
- The existing run has dead corners you cannot reach.
What Refacing Actually Includes?
New doors and drawer fronts, matching veneer on every exposed side and face frame, soft-close hinges and full-extension drawer boxes, plus new hardware. Done properly, nobody can tell it is not a new kitchen. Done cheaply, the veneer seams show in a year which is why we specify the finish in writing and warranty it.
A Real Example
An Edison homeowner came to us for a full replacement. The boxes were plywood and dead level, so we refaced, added two pull-outs and new quartz instead about $14,000 less than the quote they arrived with.
Admin
Work with New Jersey's Most Trusted Kitchen Remodeling Team
Free in-home measure, fixed line-item pricing and our own installers — across all 21 NJ counties.





